USPS awards FCA $196,377,320 contract for additional Extended Capacity Delivery Vehicles

Solicitation Number: 3DVPRT-15-B-0057 Notice Type: Award Notice Contract Award Date: September 20, 2019 Contract Award Number: 3DVPRT-15-B-0057(011) Contract Award Dollar Amount: $196,377,320.00 Contract Line Item Number: Line No. 15 in lieu of Line No. 06 Contractor Awarded Name: FCA North America Holdings, LLC Contractor Awarded DUNS: 830966904 Contractor Awarded Address: 1000 Chrysler Drive Auburn Hills, … Read more

Spartan Motors awarded $214M cargo van contract for USPS fleet

Award Date: September 29, 2017 The United States Postal Service awarded Spartan Motors the contract for Solicitation 3D-17-A-0140 (for the purchase of Cargo Vans). There will be two design types; Cab Over Engine (COE) and Cab Behind Engine (CBE). Within each design type, two sizes of cargo bodies are identified; 18 ft. and 24 ft. … Read more

New United States Postal Service Procurement Projects

Radio Frequency Identification (RFID) Feasibility Study The USPS seeks to identify if RFID could introduce a more passive scanning process and increase Surface Visibility (SV) scan compliance to assist the organization to achieve the goal of 100% product visibility (PV). Peak Air Transportation and Ancillary Services The United States Postal Service is seeking to purchase … Read more

Sources Sought For Next Generation Delivery Vehicle (NGDV) Acquisition Program

The United States Postal Service is issuing a Request for Information and Prequalification/Sources Sought for its Next Generation Delivery Vehicle (NGDV) Acquisition Program.  The purpose of this RFI is to inform prospective suppliers on the USPS’s preliminary/draft specifications and plans for acquisition of NGDV fleet replacements.  The information contained in this RFI and Sources Sought … Read more

PRC solicits ‘Study of Postal Service Institutional Cost’ report

Solicitation Number: PRC-2014-2 Agency: Postal Regulatory Commission Office: PRC Office of Administration Location: PRC HQ Excerpt: Given the severe volume decline since FY 2007, one might think that institutional cost would have declined because of the infra-marginal cost included therein.  Further one might reasonably think that the volume variability ratio should have decreased because the … Read more